The school is located at the intersection of Luma Road and Changle Road in Wuxi, with a total investment of approximately RMB 500 million.
The project has a total construction area of approximately 75,000 square meters and is designed to accommodate 36 primary school classes and 24 junior high school classes.
The main construction includes primary school buildings, junior high school buildings, an administrative and teaching complex, an auditorium, teacher dormitories, a gymnasium, a dining hall, and student dormitories.
The school's gymnasium, dining hall, and dormitory buildings use GWIPPO’s pressure-bearing hot water system. The system provides stable water pressure, comfortable water usage, large-capacity hot water storage, and up to 30% energy savings compared with conventional open water tank systems.